Island station roofs at the Wastewater Treatment Plant in Busko Zdrój, Poland

The scope of our works included the construction of two island station roofs for sludge with an area of 900 m2.

It required:

– 35 tons of steel structure
– 500 m3 of concrete
– trapezoidal sheet metal roof 1100 m2.

The project deadline was four months.